Rehabilitation Hospital Dr. Josep Trueta, Girona
![](https://molins-dev.mo2o.com/concrete-aggregates/wp-content/uploads/sites/5/2024/04/23-1.jpeg)
Structural reinforcement work was carried out at the Dr. Josep Trueta University Hospital in Girona.
Due to the change of use of activity in a specific area of the Hospital, it was necessary to reinforce the structure by applying HALF PLUS concrete (PROMSA TECH): lightweight self-compacting concrete with fibres. As it is a pumpable material, apart from being resistant, it also provides ease, speed and safety in its application.
Approximately 650m2 were made with a thickness of 10cm.
It was supplied from the PROMSA plant in Girona.