Work
AVE – Sarrià de Ter high-speed train section
In 2008, Promsa set up a works plant in Sarrià de Ter (Girona) to supply products for the construction of the Girona-French border section of the AVE high-speed railway line.
These works included the construction of 2 tunnels.
The products supplied were mainly shotcrete (gunite) as well as structural concrete.