Work

Via en placa, Barcelona Metro Line 5

This ballastless track has been built to replace the ballast on a section of L5 of the Barcelona metro.

The concrete supplied was of two types: HM20/L/10/I special static pump and HA30/L/10/IIa with polypropylene fibres, also with a special formulation for long-distance static pumps (over 300m).

The subministering was from the Montcada plant.