Building refurbishment – Capellades

In this project, reinforcement work was carried out on several floors of the building with a lightweight concrete compression layer.

The client also opted for the installation of a metal structure in conjunction with HAL PLUS, a lightweight, fibre-free, self-compacting concrete, which lightens the structural load and provides strength.

As it is a pumpable material, apart from being resistant, it provides homogeneity in the product and ease, speed and safety in its application.

Approximately 420m2 were realised for an average thickness of 6cm.

It was supplied from the PROMSA plant in Igualada.