Work

East Dock – Barcelona

In August 2012, Promsa installed 2 construction plants to be able to supply the concrete needed for the construction of the East Dock, between Barcelona and El Prat.

More than 200,000m3 of concrete for concrete cubes of about 50Tn each were produced.