Work
Multi-family building in Quart (Girona)
3 slabs were made for this multi-family building located in Quart (Girona).
250m3 of HA25 concrete was supplied per slab of soft consistency with flowable finish (with a total of 3 slabs).
All concrete was pumped by Promsa’s pumping service.