Work

Rehabilitation Hospital Dr. Josep Trueta, Girona

Structural reinforcement work was carried out at the Dr. Josep Trueta University Hospital in Girona.
Due to the change of use of activity in a specific area of the Hospital, it was necessary to reinforce the structure by applying HALF PLUS concrete (PROMSA TECH): lightweight self-compacting concrete with fibres. As it is a pumpable material, apart from being resistant, it also provides ease, speed and safety in its application.

Approximately 650m2 were made with a thickness of 10cm.
It was supplied from the PROMSA plant in Girona.