Work

Structural reinforcement – Barcelona

Structural reinforcement was carried out for this block located on Av. Diagonal in Barcelona, where Proaccess-10 was used.

There were 3500m2 and 245m3 of Proaccess-10 to cover the entire mesh using an epoxy bonding bridge supplied by the site.

The execution was carried out by the Promsa Pavements team over a period of 10 days.

The supply was made from the Promsa plant in Zona Franca.